England
Interior requirements in England.
In England the requirement is set by the Building Regulations and explained by the Approved Documents, with building control deciding on the project in front of it. This page, and the three that follow it, cover England only — not the rest of the United Kingdom.
On this page
Review guidance, not legal advice. Whether a project complies, and how it demonstrates that, is for the designer and the building control body — not for a drawing review.
The system
How England's system is built
Three layers: the regulation, the guidance on meeting it, and the body that decides on the project.
Documents
The Approved Documents that touch interiors
Three parts come up on interior drawings again and again. Others apply too — fire, acoustics and energy among them — and are usually coordinated with a specialist.
Approved Document M — access and use
Access to and use of buildings, including sanitary accommodation: the part that constrains interior geometry most directly.
Open Approved Document MApproved Document K — stairs, ramps and guarding
Stairs, ramps, protection from falling and protection from collision: where interiors meet level changes and balustrades.
Open Approved Document KApproved Document F — ventilation
Means of ventilation: extract, background and purge ventilation, and where the routes for them appear on interior drawings.
Open Approved Document FROMURE does not reproduce the text of any Approved Document and does not apply England's documents to another nation's project.
Responsibility
Who is responsible for what
A drawing review informs people; it does not take over anyone's duty. Knowing who owns each answer is what makes a review usable.
-
The designer who drew it
Owns the design, the dimensions and the specification, and answers the questions a review raises.
-
The client or dutyholder
Owns the brief, the procurement route and the decisions that change scope — including anything the brief requires beyond the regulations.
-
The principal designer, where one is appointed
Coordinates the design work and the information that goes with it on projects where such an appointment is required.
-
The contractor
Builds to the documents, raises queries where the documents conflict, and is responsible for the work as executed.
-
The building control body
Decides whether the work meets the regulations, and can accept a route to compliance that is not the common one.
Scope
England is not the United Kingdom
Building regulation is devolved. ROMURE treats each nation separately, and does not apply England's guidance to a project in Scotland, Wales or Northern Ireland.
England
- The Building Regulations and the Approved Documents
- Building control through a local authority or a registered approved inspector
- This page and the three documents linked above apply here
Scotland, Wales and Northern Ireland
- Each has its own building regulations and its own guidance documents
- Scotland's system has its own technical guidance and verifiers
- Wales has its own published guidance editions
- Northern Ireland has its own regulations and technical guidance
- ROMURE's pages for these nations are planned, not published — and are never presented as covered
Coverage
ROMURE's England coverage
Partial England coverage — Approved Documents M, K and F
ROMURE applies Approved Document M1 (dwellings), M2 (non-dwellings), K and F1 (dwellings) to England projects, as active verified packs with their editions and clauses recorded. The coverage is partial: each pack covers the scopes it was encoded for and nothing else, and England is not the United Kingdom — Scotland, Wales and Northern Ireland have their own building regulations, no rule is registered for them, and England's approved documents are never applied to a project there.
Approved Document F1 is two editions in the registry. The 2021 edition is the one in force today and the one a review applies. The 2026 edition is published but not in force before 24 March 2027, so it is carried as recorded-not-active and no review applies it in the meantime.
Drawing-based review — geometry, dimension, clearance, coordination and schedule checks — runs regardless, and each finding states its basis. See the service review and the coverage table.
Start with one sheet
England project, drawings in front of you?
Upload one page. The review will state what it checked, what it did not, and where no verified England pack applies.
No payment is taken when you start a review, and no card details are collected on this page.
